🗣️ Hablamos español CA C-10 #1132664 · Free estimates on most residential jobs📞 (415) 323-9494
Zion Electric Inc.
🔋

Powering a Brighter Tomorrow · CA C-10 #1132664

🗣️ Hablamos español

EV Charger Load Management: Avoid a Panel Upgrade for Your EV Charger

Is your panel too full for an EV charger? In many Bay Area homes, an EV charger load management device lets us add a Level 2 charger or Tesla Wall Connector to your existing panel, without the cost and wait of a main panel or service upgrade. As a licensed electrician, we install the DCC-10 EV energy management system and Siemens load management, permitted and to code.

  • ✔ Licensed · Bonded · Insured
  • ✔ Free estimates on most residential jobs
  • ✔ English / Español

What our EV charger load management installs include

  • DCC-10 EV energy management system (by RVE / DCC Electric), for chargers on 30 to 60 amp circuits
  • Siemens load management (Siemens Inhab Load Manager) for EV chargers and other large 240V loads
  • Load calculation of your home to see whether load management is the right fit
  • Current sensors on your main service that watch your home's total use in real time
  • EV charger installation: Tesla Wall Connector, J1772 and NACS Level 2 chargers
  • Permits and inspection handled, with honest advice if a panel upgrade is still the better choice

How it works

  1. 1

    Call or book online

    Tell us your vehicle, charger and your panel size if you know it. Hablamos español.

  2. 2

    Panel & load check

    We look at your panel, main breaker, available breaker space and the route to your parking spot, and run a load calculation.

  3. 3

    Clear written scope

    You get a written scope before work starts: load management, panel upgrade, or a simple dedicated circuit.

  4. 4

    Install, permit & test

    We install the load manager and charger, test that charging pauses and resumes correctly, and handle the permit and inspection.

Frequent questions

How does EV charger load management work?

The device uses current sensors on your main service to measure your home's total electrical use in real time. When the house gets close to the capacity of your main breaker, for example when the oven, dryer and AC run at once, it temporarily pauses or limits the EV charger. When usage drops, charging resumes automatically. Your car still charges overnight, and your panel is never overloaded.

Can load management help me avoid a panel upgrade for an EV charger?

Often, yes. If the load calculation shows your panel doesn't have room for a full-time EV charger circuit, the electrical code allows an energy management system to manage the charger instead of upgrading the service. It does need one open two-pole breaker space (or a suitable connection point), and your panel and wiring must be in good condition. We check all of this during the visit.

What is the DCC-10?

The DCC-10 is an EV energy management system made by RVE (DCC Electric). It is designed to connect an EV charger to a panel that is already at full capacity, on panels up to 200 amps, for chargers on 30, 40, 50 or 60 amp circuits. It watches the total load and temporarily turns the charger off when the home is using more than 80% of the main breaker's rating, then turns it back on after usage stays lower for about 15 minutes.

What Siemens load management do you install?

We install Siemens load management, such as the Siemens Inhab Load Manager. It works with most brands of panels from 100 to 225 amps and can manage an EV charger or another 2-pole load up to 60 amps. We'll recommend the DCC-10 or Siemens based on your panel and where your charger goes.

Does it work with a Tesla Wall Connector?

Yes. Load management controls the circuit feeding the charger, so it works with the Tesla Wall Connector and other Level 2 chargers. Some chargers, including the Tesla Wall Connector, also have their own power-sharing and current settings, which we set up correctly.

When is a panel or service upgrade still the better choice?

If your panel is damaged, unsafe, recalled or out of breaker space, if you're adding several large loads such as a heat pump, induction range and EV charger, or if you charge during the day while the house uses a lot of power, a panel upgrade may be the right answer. We explain both options honestly.

Do I need a permit?

Yes. EV charger and load management installs need an electrical permit and inspection from your city or county. We pull the permit and coordinate the inspection.

Do I need to contact PG&E?

In many cases, load management lets you add an EV charger without a panel or service upgrade, so there is often no PG&E service upgrade or meter change and you avoid that extra cost. It depends on your home's load. A full service upgrade, by contrast, normally requires coordination with PG&E. We'll tell you what your job needs.

Learn more

🔌 EV Charger Installation San Francisco · 🔌 EV Charger Installation Oakland · ⚡ Panel Upgrade San Francisco · ⚡ Panel Upgrade Oakland · 🚨 Emergency Electrician San Francisco · 🚨 Emergency Electrician Oakland

Ready to get started?

Call us or book online for your estimate.

🗣️ Hablamos español

📞 Call